Professional Data Center Infrastructure
Pre-Manufactured Modular Data Centers

Data Center Delivery in12 Months, Not 24

Modular. Pre-Manufactured. AI-Ready. TGC Data Global delivers enterprise-grade data centers through factory-built precision, cutting delivery timelines in half while exceeding quality standards.

50%
Faster Delivery
1.2-1.3
PUE Rating
70%
Less Waste
100+
kW/Rack AI-Ready
The Industry Challenge

Why Data Centers Still Take 24+ Months to Build

1

Custom Site Construction

Every build starts from scratch. Local labor, custom engineering, and sequential trades stack delays across the entire capacity pipeline.

2

Fragmented Supply Chains

Transformers, switchgear, cooling, bus duct — each sourced independently with 40-52 week lead times. One bottleneck cascades across the entire portfolio.

3

AI Density Uncertainty

Facilities designed for today's loads can't adapt when tenants shift from colocation to AI inference workloads demanding 50-100 kW racks next quarter.

Build Timeline Comparison

Traditional Build24+ months
Site PrepEquipment ProcurementOn-Site ConstructionCommission
TGC Modular Build12 months
Site PrepOff-Site MfgInstallCommission
50% Faster — 12 Months from Groundbreak to Energization
The Modular Approach

Pre-Manufactured. Tested. Shipped. Installed.

Every critical subsystem arrives site-ready — manufactured off-site under controlled conditions, tested before shipping, assembled on-site in weeks instead of months.

Power Distribution

Transformers, switchgear, UPS — pre-wired, factory-tested modules ready for rapid on-site integration.

Bus Duct

Pre-fabricated runs sized per design, bolted together on-site for rapid power distribution deployment.

Cooling Systems

CDUs, RDHx units, piping skids — pre-charged and leak-tested. Liquid-to-chip cooling for AI-density racks.

Containment & Raised Floor

Standardized hot/cold aisle modules and pre-cut floor tiles for consistent, optimized airflow management.

Fire Suppression

Pre-piped, pre-charged suppression skids manufactured to code and ready for immediate installation.

Controls & BMS

Pre-programmed building management systems with plug-and-play commissioning for immediate operational readiness.

Standardized Platform

One Platform — Colo Through AI Factory

Same modular components. Same installation process. Same 12-month timeline. From colocation to AI — one platform.

Standard Density
10-20 kW/rack
  • Air-cooled containment modules
  • Standard bus duct + PDU configuration
  • Traditional UPS + transformer package
Proven template — deployed globally
AI-READY
AI Factory
50-100+ kW/rack
  • Liquid-to-chip + RDHx cooling skids
  • High-amperage bus duct + power whips
  • Enhanced UPS + transformer capacity
Same platform — scaled for AI workloads

Sustainability Impact

PUE Improvement1.2-1.3

vs 1.5-1.8 traditional — factory-optimized airflow and cooling

Waste Reduction70%

Less construction waste through off-site manufacturing

Renewable-Ready Design

Pre-engineered for renewable energy commitments and carbon-neutral operations

Capital Efficiency

Faster Energization50%

Revenue online a year earlier with accelerated deployment

Lower CapEx Volatility

Factory-controlled costs eliminate site-by-site variance

Scalable Capital Deployment

Predictable unit economics for JV structures and capital recycling

Executive Leadership

The Team Behind TGC

Combined 65+ years of global infrastructure, enterprise sales, and technology leadership.

TV

Thas Visva

Chief Executive Officer

25+ years architecting datacenter facilities from site selection through commissioning — power, cooling, network, and structural design. Led groundbreaking TD Bank datacenter program in Canada, delivering mission-critical financial infrastructure at national scale. Proven operational leader sustaining 99.999% uptime across enterprise DC portfolios.

CJ

Christopher Johnson

Chief Revenue Officer

20+ years selling high-ASP solutions to $100MM+ enterprises. Co-founded Sur Technology — $8MM/yr revenue by year two, $26MM net new in 2019. Engaged Google, Apple, Samsung, Ford, and Toyota across product and market strategies. Expert in revenue acceleration and high-value market penetration.

GB

Gaylen K. Brown

Chief Technology Officer

20+ years leading global teams and nine-figure budgets at Google (13 yr) and Yahoo. Led the largest datacenter transition in Google's corporate network history. AI infrastructure expert — built high-performance clusters for Stanford University. Specializes in global infrastructure scaling and operational excellence.

Industry Intelligence

RackPulse Newsletter

Stay ahead of the curve with deep analysis on data center trends, AI infrastructure, modular construction, and the forces shaping the future of digital infrastructure.

RackPulse

by TGC Data Global

Our team's decades of hands-on experience building, operating, and scaling data centers distilled into actionable intelligence. From AI infrastructure trends to modular construction breakthroughs — written by practitioners, not pundits.

AI & GPU infrastructure analysis
Modular construction innovations
Market trends & capital deployment strategies
Sustainability & PUE optimization
Read RackPulse

Free to read — new editions published regularly

Why RackPulse?

In an industry flooded with surface-level reports, RackPulse delivers the operator's perspective. Our leadership team has collectively built and managed data centers across three continents — we write about what we know from the field.

65+
Years Combined Experience
3
Continents
$B+
Infrastructure Managed

Featured Topics

Liquid Cooling
GPU Clusters
Modular DC
Supply Chain
Power Density
Sustainability
Design & Planning Tools

Professional Planning Suite

Access our advanced data center design tools to visualize, plan, and optimize your infrastructure before deployment.

DC Floor Plan Designer

Interactive Design Platform

Create professional data center floor plans with our intuitive drag-and-drop interface. Visualize rack layouts, power distribution, cooling systems, and optimize space utilization for maximum efficiency.

Rapid Prototyping

Design and iterate floor plans in minutes, not hours

Industry Standards

Built-in compliance with Tier III and industry best practices

Collaboration Ready

Share designs with stakeholders and get instant feedback

Launch Floor Plan Designer

Free to use — start planning your data center today

Why Start with Floor Plans?

1

Visualize space requirements and constraints early

2

Optimize cooling and power distribution paths

3

Communicate vision clearly to stakeholders

4

Start productive conversations with our team

Ready to discuss your data center project in detail?

Connect with our infrastructure experts →
Ready to Connect

Let's Build Together

Whether you're planning a new deployment or exploring modular infrastructure for your next campus — our team is ready to scope a pilot and prove the partnership.

Connect with Our Team
AI-Ready Modules. Global Scalability. Sustainable by Design.

How Can We Help You?

Choose the best way to reach our specialized infrastructure teams

Business Development

New data center projects, partnerships, strategic consulting, and investment opportunities

Technical Support

Existing facility support, troubleshooting, maintenance, and operational assistance

Project Consultation

Infrastructure planning, feasibility studies, design consultation, and custom solutions

General Inquiries

Company information, partnership opportunities, media inquiries, and general questions

Other Ways to Reach Us

Phone

Direct: (949) 783-9827

Toll Free: (888) 783-9827

24/7 Support Available

Email

gaylen@tgc-global.net

Response within 24 hours

Address

1012 Brioso Ave.

Suite 102

Costa Mesa, CA 92627

✅ Contact forms ready - Click any button above to start your inquiry

TGC Data Global Logo

TGC Data Global

Modular Infrastructure. Delivered.

Pre-manufactured modular data centers delivered in 12 months — AI-ready, sustainable by design, built for the next decade.

© 2026 TGC Data Global LLC. All rights reserved.